Hydrological Analysis of Mini Hydro Power Plants (PLTM) Using The Flow Duration Curve Approach
DOI:
https://doi.org/10.54543/syntaximperatif.v6i4.792Keywords:
Mini Hydro Power Plant (PLTM), , Hydrological Analysis, Reliable Discharge, Flow Duration CurveAbstract
Hydrological analysis is crucial in the planning of a Mini-Hydro Power Plant (PLTM). This study aims to examine the hydrological aspects of the Way Besai PLTM, located in Bonglai Village, Way Kanan Regency, Lampung Province. The Way Besai Mini-Hydro Power Plant (PLTM) is a runoff-river PLTM scheme located approximately 242 km north of Bandar Lampung City, Lampung Province, Indonesia. The data used include daily rainfall data from six rainfall stations, climate element data from the Radin Inten II Meteorological Station, and outflow data from the Besai PLTA. The rainfall data were analyzed for consistency using the Mass Curve method, with only three stations deemed consistent. Potential evapotranspiration was calculated using the Modified Penman method. Furthermore, the rainfall data were converted into daily discharge data using the F.J. Mock Rainfall to Runoff hydrological method. The catchment area is 449.14 km2 at the intake site and the average annual rainfall reaches 2,366 mm/year. The analysis results are used to determine the mainstay discharge (plant discharge) and the planned flood discharge through the Flow Duration Curve (FDC). Based on these results, the Way Besai Hydroelectric Power Plant is projected to have a generated power of 9.2 MW and an annual energy of 67.513 GWh resulting from the utilization of an effective water head of 67.45 m and a maximum plant discharge of 16.5 m3/second.
References
Almeida, R. M., Schmitt, R. J., Castelletti, A., Flecker, A. S., Harou, J. J., Heilpern, S. A., Kittner, N., Mathias Kondolf, G., Opperman, J. J., Shi, Q., Gomes, C. P., & McIntyre, P. B. (2022). Strategic planning of hydropower development: balancing benefits and socioenvironmental costs. In Current Opinion in Environmental Sustainability (Vol. 56). https://doi.org/10.1016/j.cosust.2022.101175
Coron, L., Andréassian, V., Perrin, C., Lerat, J., Vaze, J., Bourqui, M., & Hendrickx, F. (2012). Crash testing hydrological models in contrasted climate conditions: An experiment on 216 Australian catchments. Water Resources Research, 48(5). https://doi.org/10.1029/2011WR011721
Griffith, H. V., Wade, A. J., Lavers, D. A., & Watts, G. (2020). Atmospheric river orientation determines flood occurrence. Hydrological Processes, 34(23). https://doi.org/10.1002/hyp.13905
Liucci, L., Valigi, D., & Casadei, S. (2014). A new application of flow duration curve (FDC) in designing run-of-river power plants. Water Resources Management, 28(3). https://doi.org/10.1007/s11269-014-0523-4
Okoli, K., Breinl, K., Mazzoleni, M., & Di Baldassarre, G. (2019). Design flood estimation: Exploring the potentials and limitations of two alternative approaches. Water (Switzerland), 11(4). https://doi.org/10.3390/w11040729
Reynolds, J. E., Halldin, S., Seibert, J., & Xu, C. Y. (2018). Definitions of climatological and discharge days: do they matter in hydrological modelling? Hydrological Sciences Journal, 63(5). https://doi.org/10.1080/02626667.2018.1451646
Soerya, S. F., Asdak, C., Kendarto, D. R., Yan, T., & Riyadi, A. (2023). F.J Mock Method For Hydrological Moel In Water Reliability Study In Leuwi Padjadjaran II Reservoir. Journal of Advanced Zoology. https://doi.org/10.53555/jaz.v44i5.3292
Vangelis, H., Zotou, I., Kourtis, I. M., Bellos, V., & Tsihrintzis, V. A. (2022). Relationship of Rainfall and Flood Return Periods through Hydrologic and Hydraulic Modeling. Water (Switzerland), 14(22). https://doi.org/10.3390/w14223618
Wang, F., Noda, K., Azechi, I., & Senge, M. (2020). Potential for and feasibility of small hydropower generation at headworks in Japan. Hydrological Research Letters, 14(1). https://doi.org/10.3178/hrl.14.23
Yuksel, I., & Demirel, I. H. (2021). Investigation of the optimal method for determining hydropower potential of small streams: a case study Batman Basin in Turkey. Arabian Journal of Geosciences, 14(7). https://doi.org/10.1007/s12517-021-06877-y
Downloads
Published
How to Cite
Issue
Section
Citation Check
License
Copyright (c) 2025 Nengah Bennuwardana, Sukendra Martha, Yosef Prihanto, Dangan Waluyo, Firmansyah Firmansyah, Bachtiar Rifai

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.